To document the restoration and repair of the Bristol Channel Cutter "Sea Star", now "Rose", following damage suffered in Sept 2008 Hurricane Ike.
Wednesday, March 6, 2013
Photos
Since last post I stepped the mast and installed the standing rigging. I still have a few bits of rigging to finish before I can bend on sails. Here are a few recent photos:
Love the leather covered hoops, where did you source these .....cheers, Avalon
ReplyDeletehttp://gaffcutteravalon.blogspot.com/
Hi Avalon,
ReplyDeleteI bought the leather hoops from a classic boat rigging shop in France, Dryade.....the same shop that provided the wooden/bronze blocks.