Change order no 420 (roughly):
Scratch the sink in the head; there is no place to put it. As I drew it up, the bottom of the sink would be right on top of the air conditioner. I could move it to the starboard side countertop but that wipes out a bank of 3 drawers. In hindsight I didn’t need it anyway....the galley sink is only 5 feet away. So, we scratch the sink, which means we don't need the sink drain thru-hull. Now we have an extra sink and seacock.
However, the hot and cold water lines have already been pulled to that location and we need a solution to the air conditioner pan drain issue. Running it into the bilge is not a good option. The new plan is to install a hand held shower and build a small sump pan with pump. The A/C pan can drain into the shower sump. A self-priming waste water pump will send shower gray water and AC water over the side at the transom.